Thursday, 26 March 2015

Race Bank Cable Installation 2014 - 2015

Installation Manager for 91 inter array cables connecting the Siemens 6MW turbines during the pre-construction and procurement phase. 

Development of all ITT documents, risk register, interface documents, route engineering, costing and time schedule to ensure flagship UK project met procurement and project timeline. Preparation of technical evaluation model for array cable installation to be adopted company wide as part of internal Cost of Electricity projects portfolio.


picture from http://www.dongenergy.co.uk/EN/UK_Business_activities/renewables/windfarms/Documents/Race%20Bank%20Briefing%20Pack.pdf

Employed by: DONG Energy. Client: DONG Energy Power (UK) Ltd