Thursday, 8 October 2015

NWWOffshore evolves: Offshore Construction Associates launches today

As my workload has expanded, it's become unrealistic to continue on my own, so I'm now the Director of my new consultancy - Offshore Construction Associates. The ethos of the business remains the same - to safely, efficiently and effectively deliver offshore construction projects, working within a happy and enthusiastic project team. If this sounds interesting, if you would like to work for us, or just to find out more, please click on the banner below!


Wednesday, 6 May 2015

LEMS Engineering and Construction Management - 2015 to Present

Engineering and construction management services for two 500MW projects in France during the de-risking phase.


Image from http://www.gdfsuez.com/en/innovation-energy-transition/new-renewable-energy/offshore-wind-powers-ahead/

Providing offshore construction expertise and advice for the development of risk registers, installation strategies and management of Pre-FEED conceptual study works. Leading the development of cross package integration, focused on engineering and offshore construction, planning the projects to take account of existing market information, offshore wind best practice, and project aspirations to accelerate industrial development in France.


Client: LEMS


Thursday, 26 March 2015

Race Bank Cable Installation 2014 - 2015

Installation Manager for 91 inter array cables connecting the Siemens 6MW turbines during the pre-construction and procurement phase. 

Development of all ITT documents, risk register, interface documents, route engineering, costing and time schedule to ensure flagship UK project met procurement and project timeline. Preparation of technical evaluation model for array cable installation to be adopted company wide as part of internal Cost of Electricity projects portfolio.


picture from http://www.dongenergy.co.uk/EN/UK_Business_activities/renewables/windfarms/Documents/Race%20Bank%20Briefing%20Pack.pdf

Employed by: DONG Energy. Client: DONG Energy Power (UK) Ltd

Thursday, 26 June 2014

Westermost Rough Foundations Installation 2012-2014

Installation Manager for 35 monopile foundations for the 210MW project using new Siemens 6MW turbines

Copyright (c) Nick Wordsworth 2014

Managing the installation process for WTG foundations from preliminary planning analysis through to completion on site, I was responsible for ensuring technical quality and safety of all processes. This included the load out, 5 foundations at a time, from a quayside within the fabrication area - see below video.





Copyright (c) Nick Wordsworth 2014
Implementing a campaign of proactive monitoring, reporting and interrogation of Contractor schedule, progress and subcontracted activities, I was able to ensure  that the key deliverables were procured, fabricated and delivered on time.


Copyright (c) Nick Wordsworth 2014

Throughout the project, I undertook internal audits and reviews within project organisation to maintain quality of technical documentation and plans. This included an extensive HAZID and subsequent risk avoidance campaign, altering the permanent works design to improve manual handling during construction and thereby minimise offshore working time.


Copyright (c) Nick Wordsworth 2014

The main installation vessel works started in middle February 2014 and were complete by end of May 2014. Secondary works completed early June 2014, 3 weeks ahead of schedule. All documentation reviewed and fully transferred to project by end of June.

Works carried out by Geosea from vessel HGO Innovation.

Employed by: DONG Energy. Client: Westermost Rough Ltd. Duration: 29 months.

Thursday, 1 March 2012

Thanet Offshore Wind Farm 2011 - 2012

Programme Manager for nine separate projects for a major UK wind farm, planned and coordinated under a single programme. Each project was undertaken during generation to minimise revenue impact and maximise work benefits. 


Copyright (c) Nick Wordsworth 2014

Works included onshore and offshore cable works, structural alterations and remediation, pontoons and piling, rock dumping, electrical inspection works, and revisions to documentation management systems.


Copyright (c) Nick Wordsworth 2014

Employed by: Noble Denton. Client: Thanet Offshore Wind Ltd. Duration 9 mths.